Deritend Bridge, anyone know anything about it?

8 10 2008

Anyone know what happened to this?

A Major Mixed Use Scheme In Birmingham City Centre

Situated between Digbeth High Street and Bradford Street, Deritend Bridge is a mixed use development comprising offices, shops, hotel and residential accommodation. Outline Planning Approval has been granted for a total area of 31, 000 sqm. The development site is bisected by the River Rea which allows for a public space in the heart of the site and a riverside walkway to generate a high level of pedestrian access into and through the development. Two basement car parks serve the multi-storey blocks over.

——————————————————————————–
Key Facts

Status Outline Planning Permission Granted
Value € 57(M)


Actions

Information

2 responses

13 10 2008
Mac

The Site has obviosly been cleared, which is progress, but the developer bought the St Anne’s site up bradford street, and I believe wanted to rework all the planning to bunk all the affordable stuff up there… not really in the spirit of Pepperpotting eh!! Either way I notice that the St Anne’s site has been cleared now too, including the two locally listed buildings, which I’m furious about, amazingly the FA Cup was made in one of those buildings, they still had the moulds, probably melted down for scrap now!

14 10 2008
Ed Robinson

This site is what is now known as Connaught Square I believe? I don’t know if this is due to a change in developer or what.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s




Follow

Get every new post delivered to your Inbox.